• Home
  • Domestic

15kw System At Bahria Phase 8 Overseas 1 , Rawalpindi

One more 15kw system completed in Bahria Phase 8 Overseas 1 , Rawalpindi
Contact for best services and with our professionally designed and installed systems you will get zero bills and no load shedding
15 KW On-Grid, Net Metering Enabled System with GI Based Raised – Structure
Monthly Savings of 50,000Rs.
Use a natural source of energy and save the planet. The future depends on your choice. Invest once take benefit until the sun is there!
15kw
On Grid
Enabled
50,000
March 12th, 2021
Bahria Phase 8 Overseas 1 , Rawalpindi